MINISTRY OF ECONOMIC DEVELOPMENT AND INVESTMENTS OF THE REPUBLIC OF ARMENIA
19 июня 2018 - 19 июня 2025
Окончание 195 дней 17 Часы 6 минут
Was designed in 1973 and finished in 1992. Originally was designed for basalt melting and processing. Has potential to produce the following products using either perlite( thermal insulation materials, industrial filters for oil filtration , glass